Only on X, don’t trust fake accs
AI/Semi Supply Chains
NFA DYOR, no paid promos; may trade/hold names disc, views my own. Sharing free AI chokepoint research
Dumb Signal has archived 1,881 posts
from Serenity (@aleabitoreddit) and classified
171 as real trade calls — each priced the day it was
made and graded by direction-signed returns at 1D / 1W / 1M / 1Y, deletion-proof.
@simoes6338 Elon hinted names like $BRUN would die off so looks like the perfect additon
$BRUN
@ryY1436253 Pretty sure there’s a lot going on with $CBRS from IPO lockups.
But the chart looks like this so it passes
$CBRS
I quite like $CIFR at $8 since their primary counterparties are $AMZN, $GOOGL + and an AI Lab.
They need financing and I remember some projects ran slightly overbudged.
But it’s quite different than others who need to buy GPUs like Neoclouds + they often get bunched into the rest
$CIFR$AMZN$GOOGL
@Bleesed2win Thanks $FLNC added to the “It’s All Over” portfolio, tracking it at ~$5.8.
FYI this is not a recommendation of any of these stocks (or their fundamentals)
$FLNC
I made a new “It’s All Over” portfolio today of even higher beta names than $AAOI.
The requirements:
1. Fell off a cliff
2. Lower than when they announced their catalysts
3. Increasing fundamentals
4. Looks like the chart
5. Short interest spiking
Stuff like $ALMU at $7, $CIFR at $8, $ASTS at $39, and some Leopold trades like $TE at $2.5, $SHAZ at $25.
Not a recommendation, just curious how this performs into year end while doomposts are everywhere.
Anyone got any other ones?
$AAOI$ALMU$CIFR$ASTS$TE$SHAZ
I'm seeing a pattern here with hyperscalers...
They act like VCs + Goldfish.
Just requires one to go secure LTAs for memory or lasers with $LITE for the rest to pile in. Since they don't want their allocation to be crowded out.
$NVDA is usually always first one... but if they have visibility over their own supply chain, why not just be the first?
$LITE$NVDA
Oh look… more memory durability evidence for $MU and co.
Following the news of $GOOGL, other CSPs such as Alibaba, Tencent, Bytedance, and are now negotiating memory LTAs with $SKHY and Samsung.
Some customers are reportedly pushing for 10 year contracts as well, into 2035.
“As U.S. companies move to secure memory supplies first, Chinese tech giants are joining the race.”
Source: Maeil News
Don't you think it's a bit strange for your hyperscalers (especially Chinese big tech) to seek LTAs 10 years out…
If there's claims of CXMT + YMTC DRAM/NAND overflooding in 2028-2029?
↗ Quoting @aleabitoreddit
$MU$GOOGL$SKHY$SSNLF$BABA$TCEHY
TY $ANT for the positive $3.4B FCF for H1 2026.
Still feels like all your AI infra names from $MU to $AAOI sold off way too hard.
Considering the billions in financing raised by frontier labs to hyperscalers..
End up ultimately flowing back to GPUs, networking, to memory.
$ANT$MU$AAOI$SIVE$AXTI$LITE
Just another $40B going into the "AI Infra" Bubble...
Elon stated this $SPCX financing would primarily fund $NVDA GPU procurement H1 2027. Which indirectly increases demand for memory, networking, etc needed.
In some other notes, VPEC today in UDN: "InP substrates is seriously in short supply" in regards to suppliers like $AXTI.
- Morgan Stanley believes that InP substrates, EML and CW lasers will be the primary bottlenecks
- VPEC emphasized that whoever can secure more raw material supply in the future will have greater pricing power and influence in the market.
Very true about supply procurement... both upstream materials like epiwafers/substrates to ultimately compute.
We're in a volatile period where all your largest companies in the world are fighting over control of the future of AI infrastructure.
Any slowdown seems unlikely.
$NVDA$AXTI$SPCX
I'm not here to blindly cheerlead or flip flop opinions every month like Chamath, so you're free to do what you want with your $1.
I agree with you that Elon is the greatest inventor in the modern era. I have friends from DOGE, Optimus, $SPCX programs, and respect his visions for space, humanoid, to FSD.
But respecting Elon doesn't mean ignoring the implications of his recent commentary on memory/neoclouds, and has nothing to do with politics or employee wealth.
$SPCX
Not actively. I've been pointing out issues with Neocloud/Colo financing since 2025 from $SLNH to $CRWV debt interest.
And maintain my opinion only a few neoclouds would survive in a few years, given they build enough of a moat to differentiate themselves against hyperscalers.
So I don't think Elon's comments are completely wrong about Neoclouds, but there's nuances.
One example was $NBIS SOFR + 2.75% $3.5B facility with Citibank, which actually has better rates than GPU financing from $2T+ companies.
So kinda hard to say neocloud financing has "entirely shut off" since this Citibank facility was announced 3D ago
I'm not arguing the merits of Elon's claims here. There's some truth to them, even if they're framed in extremes.
I'm happy to hear his opinion on the direction of the industry... but if they're mainly amplifying concerns about competitor downfall (which benefits $SPCX + $TSLA)
There's some cause for concern about how healthy that is to the town square dynamic Elon originally envisioned with X.
$SLNH$CRWV$NBIS$SPCX$TSLA
I've always defended X as the only platform to be on for financial discourse.
But it's getting harder to when the owner constantly amplifies narratives of collapse… of companies whose interests conflict with his own at $SPCX or $TSLA.
Would people be comfortable if $NVDA Jensen Huang owned $META?
And then the timelines were dominated by his amplified narratives of $AVGO failing?
I can't see how that would be healthy for grassroots discussion.
$SPCX$TSLA$NVDA$META$AVGO
Few things:
- $SIVE is targeting T1 hyperscaler deployments for pluggables, CPO, NPO. Not quite sure what you mean by Tier 2.
They have direct engagements with hyperscalers but currently are more upstream by qualifying with companies like Ayar, $JBL, $GFS, O-Net that eventually likely ends up -> $AMZN / $MSFT for example.
On financing:
- Colo players like $CIFR still need $1B+ of financing for their sites.
- Neoclouds like $CRWV need billions of financing to buy GPUs.
Higher rates + less support for financing makes it more challenging for these players.
$SIVE already raised 700M SEK for their buildout and largely rely on external foundries, so they don't have financing constraints.
There's pressure on players that need currently need financing for capex, but markets group up everyone in AI sector indiscriminately.
The second nuance is whether or not this effects the end customers in terms of demand.
I'd argue optical sector is insulated, even if overall AI capex from hyperscalers decreases, I see optical content still rising and aggregate demand rising.
And this is especially the case with new incoming players going through their first qual cycles.
$SIVE$JBL$GFS$AMZN$MSFT$CIFR$CRWV
$AXTI still the chokepoint of the entire optical buildout + demand for InP substrates will grow a lot.
They have LTA supply agreements to $LITE / $COHR and probably ends up #1 vs. Sumitomo Electric.
The main thing I'm watching is if they can pull a $SNDK style price hike. So far from some channel checks:
- Q2 2026: 50-60% increase
- Q3 2026: 10% increase
- Q4 2026: 10%+ hike
But from Coherent's SEC offering... it does look like there's a ceiling to how high % prices can go, which makes that case less likely.
We'll see how it plays out
$AXTI$LITE$COHR$SNDK
$AAOI is the perfect example. They're expanding laser manufacturing at 350%.
But they said they can't produce enough lasers to even meet their own pluggable transceiver demand. So they had to turn away hyperscalers for CPO lasers.
TBH if I were AOI, I'd reallocate toward CPO lasers and then buy lasers off merchant players like $SIVE.
But I guess they want to be end-to-end vertically integrated.
$AAOI$SIVE
$NVDA Jensen Huang on photonics: adding scale-up to optical domain, “is going to be, well, 15x” to aggregate volume.
Relating to $LITE, $COHR, and laser companies..
“I'm fairly certain the amount of optics that we need in the future will be several orders of magnitude” Huang added.
We’re already in a CW laser bottleneck, but given the time/rate for capacity expansion, I definitely don’t see it meeting the scale Jensen envisions…
Your leading merchant suppliers focusing new capacity toward UHP CPO lasers might also unintentionally make shortages around lower end ranges more severe…
Since even if you don’t reallocate capacity (which Coherent implied they’d do to maximize margins), the demand for lower end ranges increase too as pluggable demand grows.
Anyway, you’re gonna need a lot of lasers and given low BOM cost… this might trigger some fun game theory allocation wars + price hikes for supply
$NVDA$LITE$COHR
So back on your Neoclouds like $NBIS + memory read through... From $AMZN CEO + A16z interview.
Q: On memory shortages (eg. $MU / SK Hynix / Samsung):
A: "There's only so much memory, and I don't think that that shortage ends in 2027."
Q: On AWS capacity:
A: "A good chunk of 28 is sold out", "largely sold out through 2027."
Q: On capex ROI:
A: Amazon had said it would spend about $220 billion in capex for 2026. But Jassy said the company "could invest a lot more and it wouldn't be a bad use of capital"
This is probably validating economics of Neoclouds model since this comes from a pretty stingy hyperscaler like Amazon... that only serves free bananas to their employees.
Unlike trusting $META / Zuck where you the guy throws all you can eat cruise ship type buffets at every employee.
- AWS claims approximately 30-40% better price-performance than comparable AI accelerators.
Then went on to say Annapurna was "one of the very best acquisitions we've done in Amazon and the history of the company, if not the best." "We spun out a separate team in Annapurna to build an AI accelerator"
Just to give a bump to your AI custom silicon type private companies (since others like $AAPL were likely going on shopping sprees).
TLDR:
- Not really too much groundbreaking, just incremental validation of what was said previous earnings.
- Broader shortages (like memory) won't end in 2027
- Always positive to hear from $AMZN on insatiable demand + ROI given atrocious Neocloud sentiment right now
$NBIS$AMZN$MU$META$AAPL
I guess what I've seen from Chinese laser capacity expansion:
1. Dongshan/Source Photonics (索尔思): 9M/month capacity -> 22M/month Q4 -> 300m/year in 2027 (mostly EML, but blended)
Claims of 1B/year "target" for laser chips with no deadline, but I'd take this as a grain of salt.
2. Shijia (仕佳): 72M/year for 100mW CW, 2-3 year project (mainly 2029 full capacity online)
3. Yunling (云岭): 18.75M/year 70/100mW CW, 3 year schedule (mainly 2029 full capacity online)
4. Ligent (纳真), some reports stated 170M target for total capacity (also blended, lot of which is 200G EML)
5. Yuanjie: ~10M/year currently, expanding for early 2027 and 2028, but no quantities.
6. Hongchen: I think this was the perfect example of flooding H2 2026 arguments. With some some optical bears claiming 60-70M capacity...
But this turned out to completely wrong... Their actual statements were "70/100 mW products are entering small-volume production".
7. Dingxin Optoelectronics - Targeting 15M/year blended (with 70/100mW CW and 100G EML lines)
Obviously mapped many others like Everbright/Accelink and did some guesses around laser mixes, but only included public disclosures.
From your pluggable vendor channel checks:
- 70mW/100mW lasers are actually a bottleneck right now per Innolight/Cambridge channel checks, laser ASPs actually increasing.
Lasers are tighter than they were a few months ago.
I don't think there's a giant moat here, Chinese players are already competitive. But a bottleneck is a bottleneck, and anyone with capacity to monetize that will benefit, since it's a volume game.
In terms of what the larger pluggable makers are actually doing:
- Innolight September disclosure: actively introducing new suppliers and are planning to sign 2-3 year-long contracts to lock upstream capacity for lasers (still actively securing supply for 1.6T pluggables)
So there's some game theory over who can lock up qualified capacity among all your players.
Even if there's some over-ordering, laser BOM is cheap, so they'd probably want to lock up capacity with more suppliers than lose billions in downstream revenue. (also kinda hurts competitors)
- High end lines (for CPO), non-competitive with Western players like $LITE / $COHR as of next few years. But Chinese players would eventually develop the technology.
- $AAOI CEO: Chinese suppliers several years behind on high-power CPO/DWDM laser production "not in the next 2,3 years"
- $LITE CEO questioned whether claimed Chinese manufacturing capacity was translating into commercial output. "At least at the moment, we see no impact from any Chinese laser supply."
This is despite Shijia, Everbright, Yuanjie and others stating 400mW capabilities and capacity expansion targets from Chinese companies. Although Western CEOs might be disputing their reliability and capability to scale these lines.
I see lower end range bottleneck for pluggable will gradually ease as more capacity comes online 2028. But all evidence points against near-term overflooding.
The 100mW range for example, someone cited 2 years of equipment investment. Higher ranges were 3 years for equipment investment? So even some Chinese players take years for capacity to come online.
The multi year laser shortage statements from laser company executives seems to be true... especially among higher end ranges, since buildout takes a lot of time.
Legitimate competition coming from China, but as of now there's a scramble for CW LTAs among the industry in 2026-2027.
Lot of capacity is probably allocated toward higher spec lasers or EML, as seen with EML bottlenecking $LITE for the longest time (they have more supply now) that they had to buy CW off the market instead of supplying it themselves.
This is while tail end for 800G demand for example, might continue much much longer than expected with sovereign DC buildouts. So there might be some surprising dynamics for duration, we'll see.
In the end I do think supply chains will be bifurcated:
- Chinese players will prioritize domestic capabilities but heavily sources globally.
- Western players (now) prioritize Western supply chains unless China comes online with cheap enough supply (which don't see happening near-term).
TLDR:
-> Multi-year shortage definitely seems accurate for higher end specs
-> Lot of China capacity overflooding claims earlier from H1 turned out to be completely false. People keep making them for some reason across memory to photonics.
-> Chinese laser players are competitive for 70mW/100MW, meaningful expansion Y/Y, but nothing showing overflooding, given laser demand increasing, probably gradual easing into 2028.
We'll see, supply chain evolves month after month, just my current opinion from what I'm seeing.
↗ Quoting @raikk61
$LITE$COHR$AAOI
This was responding to a question this year whether their Fortune 100 was still working with $SIVE, given a lot of doubts.
They qualified it’s a “very long cycle”, “they have a lot of things to work through because it’s a biosensing application”
I use the word ~ likely since it’s not publicly disclosed. This is public supply chain inference that it’s $APPL, given 50M unit RFQ commercial scale, US, and technology/application overlap.
I’d argue Apple would be a cherry on top if it happens in 2028, not really any part of the core thesis. Main thing I’m looking for is Sivers AI DC laser revenue growth.
$SIVE$AAPL
@soohu Yep, O-Net is an existing hyperscaler supplier, but not really well known to Western audiences.
They're actually building out on an 8 channel ELSFP with $SIVE for CPO though rather than pluggable deployments.
$SIVE
I think it's always helpful to learn what's going on in the supply chain, even if you're not an investor in lasers or $SIVE.
There's a lot of dynamics + game theory that goes on in supply shortages like:
- Expanding supplier # during shortages -> more opportunities for others.
- or as seen with $LITE sold out into 2027 -> causes other hyperscalers to sign LTAs -> capacity sold out into 2029 -> hyperscalers approach $MTSI / $AAOI + others for their own ramps
or different opportunities from supply procurement info like $JBL 1.6T LRO program scaling up in H2 2027 from upstream disclosures.
$SIVE$LITE$MTSI$AAOI$JBL
$AMD was negotiating CW laser capacity LTAs from Trendforce. And are working with Ayar / $GFS for CPO deployments, (where $SIVE is upstream as the laser supplier/reference design)
So there's strong overlap in photonics.
However, AMD on Sivers website currently is likely baseband related from cellular + Xilinx.
$AMD$GFS$SIVE
I'll let this revenue projection graph I made for $AAOI do the talking. Price at $70 I find genuinely riduclous if they deliver on their projections.
Rate hikes/macro trims a lot of forward valuations. But the selloff way overshot, which I'd argue is amplified by hedge fund risk/forced deleveraging before month end reporting.
Rather than something individually wrong with the company.
$AAOI
Yes, I like $SIVE. It's a fun company to cover, since there's a lot of supply chain alpha here.
But the company completely Tall Poppy Syndromed itself last earnings.
And it's clearly shown in the drawdown.
Bit of a longer consolidated thought and some scattered bits of supply chain info:
- Sivers has 100M CW DFB laser capacity coming online Q4 2027 during an industry shortage.
And very large allocations from foundries online (they were doing these quals with Win Semi + 2 others back in 2023/2024), so they can actively monetize the bottleneck today.
The other interesting reason why bottlenecks are important (aside from ASP hikes), is because qualifications convert much faster + more likely given incentives around supply scarcity.
-> As one example, module makers have expanded the amount of suppliers, eg. (lightcounting cited companies expanding to 5-7+ suppliers from 2-3).
Innolight, for example last month responded to a question addressing tight 1.6T DFB laser supply in 2026–2027:
- Innolight was actively introducing new suppliers last month and are planning to sign 2-3 year-long contracts to lock upstream capacity
-> This is while your biggest merchant laser companies making up the world's 600m+ EML/CW laser capacity like $COHR have redirected lasers to their own programs. $LITE sold out into 2029, Landmark also locked a lot of their capacity into 2027-2029. $AAOI was an expected player, but ended up redirecting lasers into their own transceiver programs too.
And this coincides with times $SIVE has tremendous capacity available now + actively engaged with Chinese pluggables players (not saying it's Innolight, but just shows Chinese makers like Cambridge/Eoptolink are actively trying to secure laser capacity).
- Fun to note, before $JBL was announced, Sivers had and has ongoing direct engagements with hyperscalers as well.
We saw that hyperscalers approached $MTSI and $AAOI for laser capacity from their earnings transcripts (and hilariously got turned away from AAOI due to shortages).
So the odds pluggable makers or hyperscalers end up converting to capacity agreements with $SIVE seems a materially higher.
Just a little rant: for all the sellside/retail trying to model revenue, you can't just slap on a stupid 25-35% CAGR on NRE revenue since it's close to 0 revenue now.
Especially when they scale up to maybe 300M laser capacity (extrapolated from 2:1 external/internal capacity).
It's also not the same as $POET having OE packaging capacity at scale, since lasers are in a genuine shortage. So capacity is more likely to convert like how $AAOI is sold out, $LITE is sold out into 2029
We've already seen what revenue that laser capacity brings in since $LITE cited $5B in laser capacity from just one 2028 fab alone in Greensboro (on higher end ranges).
And whatever lasers Sivers sell, they're targeting ~50-60+ blended gross margins long term on maybe $3-6 for lower range lasers to $6-$12 for high end custom deployments. But no disclosures around capacity -> revenue conversion yet from Sivers.
Now here's the thing people don't really understand, "why no revenue?" for current opportunities?
$SIVE pre 2024 focused on custom development for future architectural shifts like CPO.
For custom deployments:
- We finally got conversion from 1 of their 4 or so lidar customers this week with ~ $AEVA.
- ~ $APPL was confirmed ongoing earlier this year with an explanation that "It takes tremendous amount of trials and algorithms way beyond just what we supply to them".
- All their customers from 2023-2024 like Ayar and 3 others, probably achieve volume in 2028 as CPO takes off.
Custom high end lasers programs are extremely sticky but take many years and are mainly NRE. And as seen with CPO scale up, faced delays with commercialization over the years.
So $SIVE from the CEO shift in 2024 realized "okay" let's ramp revenue with mass commercialization products today like 70mW/100mW/200mW lasers for 800g/1.6T pluggables.
And that's where they found $JBL and all your other large pluggable players today during the shortage.
Now... the work Sivers did in 2023-2024 earlier: Such as $AAPL, Ayar, $AEVA, other lidar/CPO players.
And their new mass commercialization opportunities like $JBL, $GFS, and many pluggables/NPO suppliers in engagement now.
Have all their inflection points converges 2027 onward, which is why I find the company compelling.
Where I think management went completely wrong was messaging and near-term execution:
- Deciding to focus on current tiny contracts like Seminex, AllSpace, Tachyon orders felt like the entire focus recently in earnings, shareholder letters, and media commentary
-> Brutal honesty to $SIVE management, majority of Western audiences literally don't care and it's immaterial to the valuation.
$SIVE moved 0% on all of the Seminex/AllSpace/Tachyon order announcements, and even dropped in price. But rallied like 50% on $GFS and something similar on $JBL announcement.
The reason why most took long positions in the first place was CPO.
So if $SIVE wants to go answer questions to Swedish media about "Why are you bleeding out" and defending that with cellular orders explaining pipeline conversion.
That's not going to help people stay long during drawdowns.
-> Second part was not committing to NASDAQ listing in a certain timeframe and actually executing.
- If there's delays, sure, just say it, but non-committal lawyer-like language is infuriating to hear, especially from the CFO.
I think they'll have that opportunity next month earnings to correct everything.
So wrapping up:
- There's nothing I see remotely close to $SIVE, in terms of % of global CW laser capacity they're coming online with relative to MC.
- They have a ton commercialization paths, from O-Net, $POET, $JBL, Ayar, $GFS, $AAPL, $AEVA, and many potential hyperscaler/pluggable engagements.
Even if one or two fall through, the breadth of ongoing quals is so deep + current laser bottleneck is severe, that it's more likely than not many will convert to production.
It's clear $SIVE wants to focus on dominating the laser chokepoint first, and ended up using their 700m SEK fundraise for capacity expansion.
But they should focus on communicating the billions in potential economic scale from that laser capacity conversion.
And execute on it.
↗ Quoting @crypdegn
$SIVE$COHR$LITE$AAOI$JBL$MTSI$POET$AEVA$AAPL$GFS
@Joshuachaisson I almost forgot about that, I’ll go look for some billboard space next to the $NBIS and OpenAI ones.
$NBIS